Using Available Technology Smarter
Leading Edge technology powered by global partners
The equation behind charging is simple. Power (Watts) = Voltage (V) x Amps (A).
Most new EVs now have 800V or above native architecture. Our liquid-cooled CCS2 cables can dispense power at 800A meaning that cars can achieve charging speeds of 640 - 800kW if their battery is suitable. The next generation of charging cables will be able to charge at over 1000 Amps, unlocking true MW charge capabilities with nothing more than the replacement of a cable. This will complement the increase in battery charging capabilities and truly unlock ultra-fast charging
Our power cabinets are not only the most powerful on the market, they are also modular. Provided by a global energy giant, we can build them up to the capacity we want, so that we eliminate having to share power across chargers which allows us to maximise energy throughput. We want to get customers in and out as fast as possible and won't compromise on that.
By partnering with industry leaders in both power cabinets and charging dispensers we unlock the full capability of ultra fast charging solutions without compromise. We will be able to supply as much power as our customers require at all times.
Most new EVs now have 800V or above native architecture. Our liquid-cooled CCS2 cables can dispense power at 800A meaning that cars can achieve charging speeds of 640 - 800kW if their battery is suitable. The next generation of charging cables will be able to charge at over 1000 Amps, unlocking true MW charge capabilities with nothing more than the replacement of a cable. This will complement the increase in battery charging capabilities and truly unlock ultra-fast charging
Our power cabinets are not only the most powerful on the market, they are also modular. Provided by a global energy giant, we can build them up to the capacity we want, so that we eliminate having to share power across chargers which allows us to maximise energy throughput. We want to get customers in and out as fast as possible and won't compromise on that.
By partnering with industry leaders in both power cabinets and charging dispensers we unlock the full capability of ultra fast charging solutions without compromise. We will be able to supply as much power as our customers require at all times.
Our Solution - Direct HV Connection and Battery Buffering
Combining a small local battery with HV connection allows for seamless integration with the HV distribution network, and creates a predictable and reliable load that removes the randomness of charging. The battery never exports to the grid, instead it provides the supplies the initial charge to the car and allows the grid to gradually take over. Not only does the battery stabilise the grid, but it enables us to soak up excess daytime solar in the distribution network to provide charging to vehicles over the evening peak.
Our battery solution has world best practice fire safety and low noise emissions which make it perfect for operation in an urban environment. Without any additional noise attenuation it can achieve noise benchmarks at 30m from the nearest noise receptor. APD Engineering - a Tier 1 grid consultant - has examined our grid connection strategy and agree that this is viable in over 100 Zone Substations in metropolitan Melbourne, including locations in the innter city. Next steps are to get Sydney and Brisbane mapped for expansion opportunities
Our battery solution has world best practice fire safety and low noise emissions which make it perfect for operation in an urban environment. Without any additional noise attenuation it can achieve noise benchmarks at 30m from the nearest noise receptor. APD Engineering - a Tier 1 grid consultant - has examined our grid connection strategy and agree that this is viable in over 100 Zone Substations in metropolitan Melbourne, including locations in the innter city. Next steps are to get Sydney and Brisbane mapped for expansion opportunities
Leveraging Solar generation
Typical public charging profiles are highly complementary to solar generation. Contracting directly with suppliers of solar generators creates a stable and very low cost to serve, whilst also balancing the networks at the Zone Substation level (less solar flowing backwards through transformers). The battery can absorb this solar power and provide it back to custoemrs over the evening peak, reducing stress on the network
Why our solution is the best for the grid and for customers
The initial assumption on hearing that BYD and Geely can achieve 1000kW+ charging speeds is that they would have complete ownership of the ultra-fast charging space. However further investigation suggests this is extremely unlikely. BYD and Geely use High-C car batteries at the core of their ultra-fast charger that is connected to the low-voltage, or shared high-voltage network. Essentially, they take the constant trickle from the grid, store it in their battery then blast it into a car that is using their charger. In this configuration, the ability of the battery to provide a very large volume of instantaneous power is the key. Where this configuration fails is that a standard Low Voltage grid connection does not provide enough power to refill the battery when the charger is in continuous use. At that point, the battery becomes empty and the cars then charge at the (low) rate of charge coming directly from the grid.
Transitioning to a dedicated High-Voltage (HV) connection shifts the battery's role from the primary energy source to an instantaneous buffer. This diversification allows a wider selection of modern batteries – rated as low as 0.5C – to provide the battery buffering that an ultra-fast charging station requires. Such batteries have an overload limit, which means that they can charge or discharge for short periods well above the C-Rating. This overload capacity is all that a charging station needs.
The use of Low-C batteries expands the market of potential suppliers. No longer are BYD, Geely, or even CATL gatekeepers of this technology. Other Tier-1 manufacturers such as Sungrow and Sunwoda also provide solutions that would be fit for purpose. In fact, those manufacturers also provide the liquid-cooled charging dispensers which are the true enabler of an ultra-fast charging station, whereas the likes of CATL can provide those products as part of a turnkey solution, but they would have to source them from a 3rd party supplier.
The major component parts of an ultra-fast charging solution are:
• PCS inverters
• Energy Storage
• Power Cabinets
• Dispenser Pedestals and Cooling Module
By breaking the charging station into its component parts, we are better able to evaluate the value proposition of suppliers of each component and create competition for each separate piece of equipment. Furthermore, it enables us to specify which inverters to use in order to avoid the situation where the manufacturer tries to provide unproven inverters in the Australian market, which will likely make grid connection far more difficult.